Personnal study to price MARTEZO 100% gas on biomass

 

Select items and just send the form

 
 Name
Adress
Postal code
Country
E-mail
Site:
Altitude:
Way to reach the site:   Road   Boat  Plane
Temperature minimum
Hygrometry / season (in mm): Spring Summer Autumn Winter
   
Cycle frequency:  
Business of the user:
 ---------------------Plant hours working :
per day hours
days per month days
months per year months
Effective power on the site:   kW/h electric
Power needed on the site:   kW/h electric
Kind of solid waste of fuel avalaible on the site:
Tons avalaible per month:

Delay to dry the waste of wood outside from 80% to reach 20% humidity:

-----

 

 

For instance, about 6 months are necessary after cutting in France.

Will you use therms for :
drying of solid fuel*   heating off green- houses feeding refrigerators, air-conditionned others applications
   * in case it cannot wheathered
Number of operators on the site:
Cost 1 liter of the liquid fuel on the site:  
Cost of 1 kW/h in the city:  
The solid fuel granulometry must be prepered between 3 to 15 cm according to the type of MARTEZO plant. For that, an operator can sawed off 1 m3 of wooden waste in one hour with a circular saw.
   ------------